9
2000 YELLOW PERCH PRODUCTION BUDGET
                     1/3 Acre Pond - Pond Culture
                         1000 pounds - 3000 fish
  ITEM     EXPLANATION PRICE PER UNIT   TOTAL     YOUR BUDGET
           
RECEIPTS
Yellow Perch 1 1000 lb. $3.00 /lb. $3,000  
3030
VARIABLE  COSTS
Fingerlings 2 3,182 fish 0.20 /fish 636  
Feed 3 1800 lb. 0.40 /lb. 720  
Chemicals 4 60 /acre 20  
Electricity 5 607 hours 0.085 /kWh 26  
Labor 6 210 days 0.75 hr/day 7.5 /hr 1181  
Miscellaneous 40  
Ice 0.2 lb./fish 0.10 /lb. 61
Hauling 100 miles 0.50 /mile 50  
Interest on Operating Cap. 7 mos. 9% 69      
TOTAL VARIABLE COSTS -Per Pond 2803  
-Per Pound 2.80  
 
FIXED COSTS
Operator Labor 6 22 hours 7.50 /hour 165  
Ponds 7 $9,000 15% 1350  
Aerator 8 $450 1 aerator 17% 77  
Containers 9 $10 5 containers 20% 10  
Pickup Truck 10 $25,000 10% use on enterprise 20% 500  
Seine Net $500 1 net 20% 100  
Other equipment 65  
Management Charge 11 5% of gross 150      
TOTAL FIXED COSTS 2417  
TOTAL COSTS -Per Pond 5219  
-Per Pound 5.22  
RETURN ABOVE VARIABLE COSTS 197  
RETURN ABOVE TOTAL COSTS (2219)  
                           
10
1 Fish harvested at 0.33 lb.
2 5% death loss assumed, therefore 3182 fingerlings purchased for 3000 fish harvested.
3 Based on feed conversion rate of 1.8.
4 Chemical cost is based on typical use.  Cost may be higher or lower depending on severity of disease problems
in fish population.
5 Aerators run six hours/day in June, July, & August plus 10% special aeration needs. 
10 aerators used in operation.  Electricity use = 1 kW per 1 hp/hr of aeration
6 Hired hourly labor is considered a variable cost.  Salary and operator/family labor is considered a fixed cost.
7 Pond constructed for $9000.  15% charge includes depreciation, interest, taxes, repairs, and insurance.
Pond assumed to have 20 year useful life.
8 1/2 hp aerator purchased for $450 and expensed at 17%. 
9 Containers for transporting fish after harvesting.
10 Pickup truck used for hauling fish and supplies.  10% costs charged to enterprise.
11 Management charge is an opportunity costs for operator's management skills.